Overview
This invitation for bids concerns the construction and completion of the Mount Eriama Water Treatment Plant (WTP) Master Valves & Lime Dosing as part of the Urban Water Supply and Sanitation Security and Resilience Improvement Project (UWSSSRIP).
Key Responsibilities
• Construction and completion of UWSSSRIP -Plant -01: Mount Eriama Water Treatment Plant (WTP) Master Valves & Lime Dosing.
Required Experience
- Minimum average annual turnover of US$ 8.0m.
- Financial resources to meet or exceed the total requirement for the Subject Contract of US$ 1.0m.
- Participation in at least two contracts within the last 5 years that are similar to the proposed contract, where the value of the Bidder’s participation under each contract exceeds US$ 3.0m.
- Similarity to be based on the construction and commissioning of a plant or system including: Media filtration, Chemical dosing.
- A minimum experience in the following key activities: Design, supply, installation and commissioning of control panels for media filtration and chemical dosing; Design, supply and installation of low-pressure stainless-steel pipework (alternative technical solution); Supply, installation and commissioning of instrumentation.