Overview
Invitation for bids for the construction and completion of Command Area Development Works - Siri Toi Dam, Zhob River Basin.
Key Responsibilities
- Land Development (Rough Land Leveling): Area = 700 acres
- Construction of Open Channel Concrete Lined Water Courses: Total Length = 20 km
- Installation of High Density Polyethylene (HDPE) Pipe Line System: Total Length of HDPE pipes = 30,000 m, dia 90 mm to 315 mm.
Required Experience
- Participation in at least two (2) contracts that has been successfully or substantially completed within the last ten (10) years and that are similar to the proposed works, where the value of the Bidder’s participation exceeds PKR 2,000 million or equivalent USD amount.
- Minimum average annual construction turnover of PKR 2,580 million or equivalent USD amount, calculated as total certified payments received for contracts in progress or completed, within the last three (3) years.